BASIS Upgrade Schedule

BASIS Upgrade Schedule

  1. Upgrade BASIS license dongle from parallel to USB. (Completed July 2008)
  2. Upgrade BASIS server from Dell PC running Windows XP PC to Dell PowerEdge R300 running Windows Server 2003.(Completed 12/16/08)
  3. Upgrade BASIS server software from ET625 to ET680.(Completed 1/9/2009)
  4. Rewrite local software that translates institutional student and employee data into BASIS Lenel database configuration information. (2010)
  5. Move backend DB to new server running RHEL and install Oracle 10g DB (Completed August 2011)
  6. Upgrade BASIS server from Windows Server 2003 to Server 2008 Enterprise (64-bit) R2.(Completed August 2011)
  7. Upgrade BASIS server software from ET680 to ET692 (Completed August 2011)
  8. Upgrade from a USB License dongle to a software driven license file. (Completed August 2011)
  9. Upgrade BASIS server software from ET692 to ET693. (Completed March 2015)